For Watsonville families who remembered the long aluminum slide at Ramsay Park, one piece of the old playground was still there when the park reopened on Nov. 22. The city kept the slide, gave it a different spot and built new play areas around it. After the ribbon was cut that Sunday afternoon, children went down the slides, climbed and used the swings, The Pajaronian reported from the park. It was a first look at the remodeled playground and a return to parts of Watsonville’s largest park that had been closed for construction.
Ramsay Park covers about 26 acres between Main Street and Harkins Slough Road, west of Watsonville Slough. Ramsay Park first opened in 1973. Some familiar recreation spaces stayed in use during the work, including the tennis courts, paved cycling pump track, skate park and Soccer Central, the indoor arena pictured in the archival photo accompanying this story. The reopening brought back access to other sections rather than opening a park on previously unused land. The city invited people to start at the playground for the main ribbon cutting and scheduled separate recognitions for the dog park and both outdoor fields.
The playground has different areas for younger and older children, with swings, equipment that spins and places to explore sound and other sensations. The new features share the site with the original slide, which the city said its project architect helped incorporate into the plan. At the opening, a Watsonville resident described going without an inclusive playground growing up and spoke about what the new space could mean for children with and without disabilities, as well as the adults who accompany them. The city said the play area was designed to give children with varying abilities a place to play together.
There are changes beyond the playground. The Pajaronian reported that the dog park has separate areas for large and small dogs and that the wider renovation added accessible routes, places to picnic and lighting improvements. Twelve mosaic medallions show local wildlife and scenes from the natural environment, giving visitors art to look for as they move around the site. The city’s reopening schedule included an art tour with representatives from its Public Works Conservation Team and Watsonville Wetlands Watch. The schedule described what was planned for the afternoon, rather than establishing turnout at each stop.
The two fields were built for different uses. At the Gulermovich Multi-Use Field, synthetic turf replaced a former softball field and can accommodate both softball and soccer. The Sotomayor Soccer Field got natural turf, irrigation, terraced seating and lighting. Its renovation was part of the reopening celebration, but the city says the field itself will remain closed through April 2027 while the grass takes root. The park's Family and Nature Center is also still being renovated, with the city anticipating a fall 2027 opening. The park otherwise returned to its regular public hours, subject to posted restrictions and scheduled activities, according to the city.
Watsonville’s parks department began gathering community input with design firm Verde Design in 2019. The work fed into a broader parks strategy as well as the plans for Ramsay Park and City Plaza. The Pajaronian reported the price of the Ramsay renovation at $34 million. Watsonville lists several funding sources, including money from the voter-approved Measure R, a $7 million state grant and federal American Rescue Plan funds. City Manager Tamara Vides told the newspaper that putting the project together took years of planning and work to assemble the funding.
The park’s namesake also came up at the opening. Will “Doc” Ramsay moved to Watsonville in 1908, practiced veterinary medicine and later served in city government, including two terms as mayor. His great-grandson helped dedicate a plaque in his honor at the celebration, The Pajaronian reported. It was another piece of a long-established park that visitors could recognize alongside the new equipment. The park had been in public use for decades before Sunday’s ribbon cutting. The changes people came to see were about how it could be used in the years ahead, starting with a playground they could use that afternoon.
Reader responses