GENUINE GOOD / SEARCH

Find the good.

Type at least two letters to search the full archive.

South Richmond turns a former rail line into a two-mile walking and biking trail

A stone gazebo on the far shore of Forest Hill Park’s tree-lined lake in Richmond, Virginia.
Forest Hill Park’s lake and stone gazebo in May 2015. The James River Park System master plan places the lake along the broader Reedy Creek Greenway connection. This archival photo does not show the new rail trail. olekinderhook / Wikimedia Commons, CC BY 3.0. · Photo by olekinderhook · source article · CC BY 3.0

The James River Branch Trail links schools, shops and neighborhoods, and a nearby connection leads toward the city’s river parks.

Editor's Note: Sources and receipts for this article can be found below!

South Richmond got a new route on November 19, and people started using it that day. The James River Branch Trail opened along a former CSX rail corridor, running about two miles from Westover Hills Boulevard to Hopkins Road. Sarah Vogelsong of The Richmonder saw students from the nearby high school walking in pairs and a cyclist riding through near Broad Rock Road. Mark Person, who grew up nearby, biked across town for the ribbon cutting and told the outlet he expected to use the path.

The trail’s northwest end is near Crutchfield Street and Westover Hills Boulevard. RVAHub’s Richard Hayes published photographs of the ribbon cutting that morning and reported that the route took about 19 years to come together. The rail corridor already ran through the area; what changed was who could use it and what they could use it for. A strip of land once made for freight now gives people on foot and on bikes a route across part of Southside.

Richmond’s parks department describes the greenway as a paved, 10-foot-wide shared-use path connecting neighborhoods, schools and businesses. The mix of places it serves is part of the point. For someone who lives along it, a section can be useful even if they never travel the entire two miles. The same path can serve a person taking a walk and someone making a trip with a destination in mind. The project brings those uses together without requiring everyone to start at a trailhead.

The new route doesn’t eliminate busy streets. Midlothian Turnpike, Hull Street Road and East Broad Rock Road still cross its course. The Richmonder reported that beacons and other traffic-calming features at the crossings alert drivers to people on foot and on bikes. Along the way, the path links to surrounding neighborhoods and to destinations such as Southside Plaza. The outlet also reported that about $9 million in federal American Rescue Plan funds helped turn the long-standing plan into a built trail.

At the Crutchfield Street end, the new trail is also part of a way into the city’s river parks. Richmond’s capital-projects listing describes a connector that goes through Crooked Branch Ravine Park and crosses Reedy Creek at 42nd Street before continuing through Forest Hill Park toward the James River Park System. The Richmonder reported that Crooked Branch Trail had opened as well. These are distinct paths: the branch trail follows the former rail corridor, while the other route carries people onward through the ravine.

Forest Hill Park’s lake helps put that connection on a map. The James River Park System master plan identifies the Reedy Creek Greenway as a link between the river parks and the James River Branch Trail, and describes an alignment along the park’s existing loop beside Reedy Creek to the lake. Other parts of the plan follow existing paving near the lake and the stone retaining walls on the climb toward Forest Hill Avenue. The lake and its stone gazebo are an older part of the landscape, not part of the new rail trail itself.

Looking at the two projects together shows how a short trail can change a trip. A path through a ravine serves a different purpose from a path through shopping and school corridors. When those pieces meet, people don’t have to use either one only as an out-and-back. They can choose where to join, where to leave and whether to keep going toward a park. That makes Crutchfield Street more than an endpoint on a rail-trail map. In the city’s design, it’s where the route past homes and businesses meets a way into the park system.

In recent years the project was still something planners and neighbors could point to on a map. On opening morning it was something the students and the cyclist could use, even if they never saw the ribbon being cut. After nearly two decades of planning, that ordinary use is the part of the opening that will matter on the next school day and the next weekend.

Sources and receipts

These records support the reported claims and show when each source was published.

Capital Improvement Projects: James River Branch Trail and Crooked Branch Trail Bridge · Date not listed ↗

City of Richmond Department of Parks, Recreation and Community Facilities · supports: Names and describes the exact James River Branch Trail project: roughly two miles of paved, 10-foot-wide shared-use trail, intended neighborhood, school and business connections. Documents a Crooked Branch link from Crutchfield Street across Reedy Creek at 42nd Street, through Forest Hill Park toward the James River Park System. The project listing supports scope, not the opening date.

On Southside, the city’s first official rail-to-trail path opens · 2026-11-19 ↗

The Richmonder · supports: Sarah Vogelsong’s original on-site report and photographs confirm the completed November 19 morning ribbon cutting, former CSX corridor from Westover Hills Boulevard to Hopkins Road, about $9 million in ARPA funds, and observed students and bicyclist using the path. Documents three arterial crossings with safety measures, links to Southside Plaza, and opening of the Crooked Branch connection.

James River Park System Master Plan · 2019-10-16 ↗

James River Park System · supports: Park plan supports contextual geography: the Reedy Creek Greenway connects the river park system to the James River Branch Trail, and the Forest Hill Park alignment follows Reedy Creek to the lake. It describes sections of the existing lake-side asphalt path and historic retaining walls. Not evidence of recent completion.

What did this story leave you thinking?

SIGN IN TO LIKE0

Reader responses

No responses yet. A thoughtful first note can change the shape of a conversation.