GENUINE GOOD / SEARCH

Find the good.

Type at least two letters to search the full archive.

More than 4,000 turn out to preview Singleton’s new bypass

A freight train crosses an older railway bridge over the Hunter River in Singleton.
A freight train crosses the Hunter River at Singleton, New South Wales, in 2012. This archival photograph shows a railway bridge, not the bypass or the 2026 event. Bluedawe / Wikimedia Commons / CC BY-SA 3.0. · Photo by Bluedawe · source article · CC BY-SA 3.0

A free November 22 open day let residents walk or take a bus across part of the new route before it opens to regular traffic.

Editor's Note: Sources and receipts for this article can be found below!

For one Sunday in Singleton, the new highway belonged to people on foot. More than 4,000 people attended a free community open day on November 22, according to local station 98.1 Power FM. They could walk part of the new bypass and see it from a tour bus, getting a close look at the bridges and floodplain before the road opens to regular traffic.

The event in the New South Wales town was a public preview, not the opening of the highway to drivers. Transport for NSW organized it to let residents see the route for themselves. Its event listing described two ways to do that: a self-guided walk or a bus tour across the Hunter River floodplain, with opportunities to stop and take photographs.

Power FM reporter Cameron Smith photographed visitors lining up to walk the new road. Power FM reported that attendees could tour the project’s six bridges, four of which span rivers and floodplain. Music and food were on offer as well. Smith also photographed people walking on the new road during the event. The organizer sent visitors to Rose Point Park and directed them from there toward the Putty Road interchange, where they could enter. The planned shuttle went north through the McDougalls Hill cutting, a section beyond the space set aside for walking.

The bypass adds an eight-kilometre section to the New England Highway. The April project update from the New South Wales government puts the joint Australian and state investment at A$700 million. Smith reported that the route goes around five sets of traffic lights. That gives through traffic, including heavy freight, a way around the town centre once the full route opens.

A route that sends traffic around a town still needs to give people a way back into it. The state’s project update says a full interchange at Putty Road and connections to the existing highway, including at the southern end and at Gowrie in the north are part of the design. At the open day, Upper Hunter MP Dave Layzell pointed to a connection to John Street as a way visitors would still be able to get to the main shopping area, Power FM reported.

The state had already moved drivers onto a small part of the new alignment in April, when it reported a traffic switch at the southern connection. That change did not open the full bypass. The route people visited in November still had no announced date for regular traffic. Roads Minister Jenny Aitchison told Power FM some tie-in work would continue after the opening and said the date needed to be settled before it was made public.

On an ordinary highway trip, the bridges will take people across the rivers and floodplain without much reason to stop. The open day turned that around. Visitors were encouraged to take their time, look from the road itself and take pictures. People who preferred not to do the walk could join one of the buses. Transport for NSW required advance registration and limited attendance, so it was a managed event rather than a general invitation to come and go on the road.

The local coverage distinguishes what people could already do from the changes they are waiting for. Residents who had followed the project could stand on a section of the new route and see how it crossed the landscape. The promised benefits, such as a smoother trip through the wider Hunter region and less heavy traffic on streets in town, will depend on what happens after the road opens and people change the way they drive.

For now, the community day had a result that could be counted. Thousands turned out before the full bypass opened to regular traffic. Some took the bus, some walked, and at least one photograph showed a line of people where drivers will one day be looking for room to merge. For that afternoon, getting somewhere quickly wasn’t the point. People could stop right on the road and look out across the floodplain.

Sources and receipts

These records support the reported claims and show when each source was published.

Singleton Bypass opens for Community Day · 2026-11-23 ↗

98.1 Power FM · supports: Cameron Smith original observed after-action and photos of people walking; more than 4,000 attended Nov. 22, six bridges with four spanning rivers and floodplain, music/food/buses, John Street access and no opening to road traffic. Five sets of lights and ongoing tie-in work are stated by the report.

Singleton Bypass – Community Open Day · Date not listed ↗

Transport for NSW (Eventbrite) · supports: Exact organizer listing for free, capped registration Nov. 22; self-guided walking route or accessible bus over Hunter floodplain into the McDougalls Hill cutting, Rose Point Park arrival near Putty Road.

What did this story leave you thinking?

SIGN IN TO LIKE0

Reader responses

No responses yet. A thoughtful first note can change the shape of a conversation.