A former railroad corridor in downtown Jackson, Mississippi, is open to people walking and biking. The Jackson Heart Foundation and its partners cut the ribbon on the Capitol Green Connector on Thursday, Nov. 19. The half-mile path connects the Two Mississippi Museums, the Old Capitol Museum, the former GM&O Depot and Hal & Mal’s restaurant. It has native plants, murals and a stormwater feature alongside the route. The opening was held near the Amite Street trailhead, behind the Old Capitol Museum, the Clarion Ledger reported from the event.
The new segment is part of a project called the Museum Trail. The distinction matters for anyone planning a trip. The half-mile downtown connector is open now. It is not the six-mile corridor that backers ultimately want to build across Jackson. For now, a visitor near Amite Street can get onto the path behind the Old Capitol Museum and use it to reach several stops on one outing. Those stops include the historic depot as well as the Two Mississippi Museums, which are not in the same building as the Old Capitol Museum.
The Clarion Ledger reported that the connector took six months to build and cost about $1.3 million. The Mississippi Outdoor Stewardship Trust Fund provided $250,000, according to Visit Jackson, with additional backing from government, business and philanthropic partners. The idea goes back further than the construction timetable. Dr. Clay Hays and David Pharr had worked together on the board of the Greater Jackson Chamber Partnership, where a rails-to-trails project became part of a strategic plan. The Jackson Heart Foundation carried the project forward.
A new use for an old route
The rail line did not start out serving downtown museum visitors. Barry White, director of the Mississippi Department of Archives and History, said the corridor was part of the New Orleans Great Northern Railroad, which was completed in 1909 to connect Jackson with Slidell and New Orleans. It was built to move lumber and later carried passengers. The trail puts part of that transportation corridor back into use at walking and biking speed. Along the way, visitors can see the restored Merci Train, and the historic GM&O Depot marks its centennial in 2027, Visit Jackson reported.
The landscape has a job beyond framing the path. Design lead Travis Crabtree said the team planted American sycamores for shade and used grasses and wildflowers native to the Jackson Prairie, including little bluestem and coneflower. Shade will depend on the young trees growing. A planted stormwater channel, called a bioswale, and additional ground that can absorb water are intended to limit runoff toward the Pearl River. The opening does not provide measurements of how much runoff the new design will prevent. Reshonda Perryman and Ricardo Moody made the murals along the route.
The route also gives Hal & Mal’s a stop on the trail. Co-owner Mary Sanders Ferriss Cavicchi told Visit Jackson that the project had turned land that was doing little six months earlier into a connection between downtown destinations and the restaurant. That is a change in how people can reach the business. It is too soon to know whether it will change the number who come in, and neither the opening release nor the Clarion Ledger’s report offered visitor totals.
What’s still on the map
Visit Jackson says the Capitol Green Connector is one of four planned downtown phases. The next proposed half-mile piece would extend from Court Street toward the arts district, where the Mississippi Museum of Art and other venues are located. A separate connector would close the gap between the Mississippi Farmers Market and the Two Mississippi Museums. The longer plan includes links through West Jackson to Jackson State University. Organizers aim to finish the downtown project by 2030, but those links are not part of this opening.
For a first visit, the useful landmark is the Amite Street trailhead behind the Old Capitol Museum. This week’s change is a short path people can take now, whether they have time for one stop or want to walk between several of them.
Reader responses