North Huntsville’s Meek Greenway now has a 1.3-mile paved stretch open to people walking, running and cycling. City leaders cut the ribbon Nov. 5 at Mastin Lake Road, where the new segment’s raised crossing and parking area are located. The route honors Opal Meek, a longtime neighborhood advocate whose name was given to the project in 2023. The opening marks a public-access milestone for a planned link between Sparkman Drive and Alabama A&M University, though a short connection to the campus is still ahead.
The City of Huntsville says construction on the new segment began in 2023. The path is 12 feet wide and paved, with the ceremonial opening held at its Mastin Lake Road crossing. A nearby parking area gives people a place to begin a walk or ride. City officials describe the greenway as an outdoor recreation amenity for residents and Alabama A&M’s campus community, with walking, running and cycling among the ways people can use Huntsville’s greenways.
The full route is not finished yet. The city says the final 0.35-mile segment connecting the greenway to Alabama A&M is scheduled to begin construction in spring 2027, along with a new connector road. The recently opened stretch is therefore a completed section of a larger project, not a claim that the entire campus connection is already open. Keeping that distinction clear helps residents understand what they can use now and what remains on the construction schedule.
The greenway was named for Meek at an earlier ceremony in May 2023, when the city and the Land Trust of North Alabama announced the 1.65-mile project. At that point, the route was a plan; the city’s Nov. 5, 2026, notice says construction began that year and identifies the remaining 0.35-mile piece. The 2026 ribbon-cutting is a practical next step in a project that has taken several years to move from a public announcement to an open section of trail.
Meek’s name was attached to the project because of her work in North Huntsville. In a 2023 account, local outlet 256 Today described her as a member of the Council of Neighborhood Associations who had advocated for better conditions in her neighborhood near Alabama A&M. 256 Today quoted Commissioner Violet Edwards recalling that Meek emailed her information about neighbors who had died for the community newsletter; the story also reported that Meek picked up litter in her neighborhood. Those small, regular acts offer a picture of neighborhood service that fits a path built to connect places residents use.
At the 2023 naming ceremony, city and Land Trust representatives described the greenway as a way to bridge neighborhoods and recognize Meek’s persistence. The City’s more recent announcement again linked the project to her longstanding work, with Mayor Tommy Battle saying the dedication reflected the lasting effect of her efforts in North Huntsville. Meek thanked supporters and said residents would enjoy the trail for years. The trail gives that public appreciation a daily, usable form.
Huntsville’s broader trail network helps explain why one segment matters. The city’s current Trails & Greenways page says its plan was first adopted in 2006 and updated in 2017. The revised system envisions 312 miles of interconnected trails, greenways, greenlinks and complete streets; the same page lists about 73 miles of existing greenways and trails. Those figures describe the citywide network, not a measure of the Meek Greenway or a promise that every planned section is complete.
At the Nov. 5 opening, District 1 Council Member Michelle Watkins described the new route as a connection between Alabama A&M and nearby neighborhoods and said it offers another way for students and residents to enjoy outdoor activity. Parks and Recreation Director James Gossett made a similar case in comments reported by WAFF, pointing to the value of adding an outdoor space in communities that did not have one. Their remarks frame the path as a local amenity as well as a transportation link.
For now, the new section supplies a defined place to walk, run or ride while the last campus connector remains on the schedule. Its width, crossing and parking area are concrete features people can use; the future 0.35-mile segment will determine when the planned route reaches Alabama A&M. Naming the path for Meek keeps her neighborhood work visible, while opening it gives that recognition a practical purpose in North Huntsville’s everyday landscape.
Reader responses