On Nov. 23, a group of university students stopped around a map in a building that had stood unfinished on the Saigon River for years. The students, from Tôn Đức Thắng University, compared what they saw in the display and talked with specialists. One told the newspaper Tiền Phong that the visit encouraged him to keep studying and made him want to take part in projects of the kind shown there. Around them, other visitors were trying the large digital planning map on the ground floor.
It was the first day the public could visit Ho Chi Minh City’s Planning Exhibition Centre in Thủ Thiêm. The opening came 13 years after work began. The first exhibition gives people a month to look at the city’s 2025–2050 master plan through maps, scale models and interactive displays. The government’s opening-day account also pointed visitors to the city planning department’s website, where the documents can be downloaded. The opening made those materials available to examine in person as well as online.
Planning can feel remote until a map shows a familiar place. The third-floor displays let visitors explore the boundaries and plans for wards, communes and special administrative areas, as well as individual projects. A resident interviewed by Đời sống & Pháp luật said the displays helped him understand how the city might develop around more than one center. He picked out drainage and flood control, and development organized around public transportation, as topics he wanted other residents to see. Those were proposals on display, not improvements already delivered.
The floor below steps back from the current plan. It covers how Ho Chi Minh City and the former provinces of Bình Dương and Bà Rịa–Vũng Tàu developed before their merger, with maps showing earlier approved plans. The ground-floor displays return to the plan approved on Oct. 31. They present drawings on subjects as different as rail and road links, drainage, land use, and green and waterfront areas. The contrast between the historical maps and the new drawings lets visitors see which ideas carry forward and which belong to the expanded city’s plan.
Getting the building to that point took much longer than anticipated. Construction began in 2013 with an expected two-year timetable. Đời sống & Pháp luật reported that work paused in 2018 after the basic structure was up. A contract covering the exterior glass and other parts of the facade ran into problems. Until the building could be enclosed, contractors could not press ahead with the interiors and mechanical work. Some parts already installed deteriorated during the delay and needed repairs when construction resumed.
The outside is still the first thing many people notice. The two tilted parts of the building lean toward one another, giving the building a triangular shape when seen from the front. One visitor told Đời sống & Pháp luật that she could not tell from outside how the building would work as an exhibition hall and had wanted to see it completed after years of waiting. The opening gave her an answer: inside, an upper level overlooks the open ground floor, allowing people to see models from above as well as from the same level.
Tiền Phong also spoke with geography and urban studies lecturer Phan Đình Bích Vân, who visited with students. She saw the exhibition as a way for them to connect their coursework with the history and culture of the places they study. The plans on the walls stretch decades beyond a university course, and the opening does not tell residents when a particular road, rail line or drainage project will materialize. But the maps are no longer confined to a planning document. People can stand around them with classmates, compare them with earlier maps, or ask how the proposal relates to the places they know.
That is a different use for a building that spent years unfinished. For the month of the first exhibition, the centre gives residents time to return with another question, and gives those who cannot get to Thủ Thiêm an online route to the same planning documents.
Reader responses