GENUINE GOOD / SEARCH

Find the good.

Type at least two letters to search the full archive.

A Nearly 1.5-Mile Chattanooga Greenway Connects North Shore to Moccasin Bend

Explore a serene bicycle lane surrounded by lush greenery on a sunny day.
Photo by Egor Komarov · Pexels source · Pexels License · Representative stock photo; does not depict the reported event.

The paved connector follows Manufacturers and Hamm roads, offering pedestrians and cyclists a route to National Park Service trails.

Editor's Note: Sources and receipts for this article can be found below!

Chattanooga’s Moccasin Bend Connector opened to pedestrians and cyclists on Saturday, Sept. 26, creating a nearly 1.5-mile paved route along Manufacturers and Hamm roads. The Chattanooga Times Free Press reported that the new path links the city’s North Shore with access to existing National Park Service trails in the Moccasin Bend National Archeological District. The city’s event listing had invited the public to mark the opening with a free gathering on Hamm Road and a community trip toward Renaissance Park. The Times Free Press confirmed that the official opening took place that Saturday.

The connector addresses a practical problem along a busy corridor. The Times Free Press reported that the former route had an element of danger because of the tractor-trailer traffic along it. The new paved path gives pedestrians and cyclists a safer way to reach the district’s existing trails. It adds a route for nonmotorized travel alongside roads where heavy-truck traffic had been a safety concern.

At the opening, Chattanooga Deputy Chief of Staff Darren Ledford described the difference through his own experience. He told the newspaper that he had ridden Manufacturers Road to Moccasin Bend hospital many times over the years. As trucks passed nearby, he said, he stood on the new connector and felt for the first time that there was a safe path. His observation gives this public-works project a human measure: a cyclist who had long used the road now saw a route he considered safer.

North Shore resident Jim Johnson, a longtime trails and outdoors advocate, spoke with the Times Free Press about how the connection fits into a larger network. He described trail-building as a series of small steps that compound over time. Although the connector is not quite a mile and a half, he said, it plugs into many other stretches of trail. The point is not that this one path completes a regional system. Rather, it makes a specific link between North Shore and existing routes around Moccasin Bend, adding another usable segment to the network.

The project’s history stretches back well before construction. City Public Works engineering manager Greg Herold told the newspaper that the greenway’s roots reach back to planning work in the 1980s, while the project did not begin in earnest until 2015. From design through construction, the greenway cost $4.2 million, according to Herold. That timeline spans decades, from early planning to delivery. Its practical result is a paved link for people on foot or bicycles between North Shore and the existing trail network at Moccasin Bend.

Chattanooga’s Outdoor Chattanooga event listing described the route as short, flat and highly accessible. It promoted the Sept. 26 event as free and open to the public, with a ribbon-cutting on Hamm Road followed by a community trip toward Renaissance Park. The invitation included walking, biking, jogging and stroller use, so the official program was framed for neighbors with different ways of getting outdoors. The listing scheduled the event from 8:30 a.m. to noon. The Times Free Press report confirms the greenway’s opening, though it does not give an attendance estimate.

One nearby project is still in the future, and it is separate from the connector’s opening. The National Park Service plans to develop an open field beside the greenway on Hamm Road as a visitor gateway to the archaeological district. Superintendent Brad Bennett told the Times Free Press that the first phase is slated to break ground in 2027. That phase is expected to include off-street parking, restrooms, a bioswale to filter runoff and a path to the Tennessee River. Those facilities were not part of Saturday’s opening; the connector is open while the visitor gateway remains planned.

Moccasin Bend also carries a history that deserves careful attention alongside any account of new access. The National Park Service says the district contains archaeological sites documenting about 12,000 years of American Indian occupation. The agency also identifies Brown’s Ferry Road, which crossed Moccasin Bend, as part of the Trail of Tears National Historic Trail, commemorating the forced removal of Cherokee people from their ancestral homelands. The new connector follows Manufacturers and Hamm roads; the Park Service’s account identifies Brown’s Ferry Road as the historic route. Keeping those descriptions distinct helps recognize both the practical use of the new path and the significance of the landscape it connects people with.

The greenway’s opening can be understood as a useful addition to Chattanooga’s everyday public spaces: a nearly 1.5-mile connection that helps pedestrians and cyclists get between North Shore and established trails at Moccasin Bend. The event was described as a free community outing, and the path now gives people a new way to reach the area without making the same kind of trip along a road shared with heavy truck traffic. The route does not complete the region’s trail network or replace the visitor facilities still planned for later. It adds one accessible link, built over years, in a place where the land’s human history reaches far beyond any modern project.

Sources and receipts

These records support the reported claims and show when each source was published.

Moccasin Bend Roll & Stroll: Greenway Grand Opening · 2026-09-26 ↗

Outdoor Chattanooga · supports: The event listing identifies the Moccasin Bend Roll & Stroll greenway grand opening on September 26, 2026, from 8:30 a.m. to noon.; The organizer invited the public to a Hamm Road ribbon-cutting and community trip toward Renaissance Park.; The listing describes the path as short, flat, highly accessible, free, and open to the public, with walking, biking, jogging, and stroller use.

Chattanooga opens Moccasin Bend Connector greenway · 2026-09-26 ↗

Chattanooga Times Free Press · supports: Reporter Sam Still confirms the greenway officially opened September 26 and links North Shore with National Park Service trails.; The report describes a nearly 1.5-mile paved path along Manufacturers and Hamm roads and the prior tractor-trailer safety concern.; The report attributes statements about the route to city Deputy Chief of Staff Darren Ledford and trails advocate Jim Johnson, interviewed by the newspaper.; City Public Works engineering manager Greg Herold gives the 1980s planning roots, 2015 start in earnest, and $4.2 million design-to-construction cost.; The report describes the separate NPS visitor-gateway plan and says its first phase is slated to break ground in 2027.

Moccasin Bend National Archeological District · 2021-04-27 ↗

National Park Service · supports: The National Park Service says the district contains archaeological sites documenting approximately 12,000 years of American Indian occupation.; The NPS identifies Brown’s Ferry Road across Moccasin Bend as part of the Trail of Tears National Historic Trail, commemorating the forced removal of Cherokee people.

What did this story leave you thinking?

SIGN IN TO LIKE0

Reader responses

No responses yet. A thoughtful first note can change the shape of a conversation.