GENUINE GOOD / SEARCH

Find the good.

Type at least two letters to search the full archive.

Marblehead’s old school playground opens as the Park on Elm

Stone steps rise along a narrow passage between two clapboard buildings in Marblehead.
A July 2008 archival view of a passage toward Elm Street and the former Gerry School in Marblehead, not the park or its opening. joefrogger / Wikimedia Commons, CC BY-SA 3.0 (https://creativecommons.org/licenses/by-sa/3.0/). · Photo by joefrogger · source article · Creative Commons Attribution-ShareAlike 3.0 Unported

Neighbors spent two years raising money to rebuild the public space. When it opened on Nov. 15, the new playground had a wooden boat, a rebuilt court and benches made with stone from a buried town reservoir.

Editor's Note: Sources and receipts for this article can be found below!

The new wooden boat at Marblehead’s Park on Elm never has to leave shore. It is part of a playground that opened Sunday, Nov. 15, behind the former Elbridge Gerry School in the Massachusetts town’s historic district. There were children on the swings and around the boat soon after the ribbon was cut. The Marblehead Current, which covered the opening, estimated the crowd at about 200. The opening ended a wait that had included roughly two years of fundraising and construction.

The playground is at 50 Elm St., where the former school once had its play yard. Neighbors who wanted to keep the site available for public play organized as Friends of the Park on Elm Street. The group says it set out to rebuild the park on the existing site rather than replace it with a different use. Its members worked with the town and landscape architects Crowley Cottrell. The architects held three community meetings, the group says, so that the design could reflect how neighbors already used the space and what they wanted to change. For the Friends, the site mattered as much as the new equipment. Their stated aim was to keep a free outdoor gathering place in a neighborhood where the old school playground had served people well beyond the school day.

It was not just a matter of swapping old equipment for new. The finished park includes new swings and a wooden play boat, a round patch of grass and a basketball court. The Marblehead Current reported that the work also paid for trees, landscape planting, irrigation and improvements to parking. The combination means there is space for a game on the court without making the court the whole park. In the paper’s opening-day account, children tried several of those spaces during the opening.

The Friends say they raised more than $500,000 in charitable contributions over two years. That is a fundraising figure, not the final construction bill. The town used federal recovery money to pay for the first phase, and donations supported the next phase. Boston North News reviewed the town’s bid records and reported that the two main contract awards totaled $631,105. That total leaves out some costs paid separately, so it should not be read as the entire price of the park. What the figures do show is how much work lay between neighbors identifying a problem and the gate finally opening.

One thing neither the donors nor the designers initially expected was an old granite reservoir beneath the site. Workers found it while excavating. The Current described it as a roughly 140-year-old cistern once used by the fire department. The discovery complicated the construction, but some of the stone stayed in the project in a different form. Pieces became benches where people can sit by the new playground. Material once buried beneath the schoolyard is now visible to anyone who stops for a rest.

The Sunday opening was for public use. A larger celebration and permanent recognition for donors are planned for later, the Marblehead Independent reported. That distinction matters for families deciding when they can go: they are not waiting for that event to use the playground. The Independent also noted that the park is behind the old school on Elm Street. It is not the separate Gerry Playground on Stramski Way, as the Boston North News report notes.

There is still a lot of the old place in the new one. It is on the same lot, within the same short walk for neighbors, and even some of its stone came out of the ground underneath it. What changed is what people can do when they get there. There is a bench for a conversation, grass next to the play equipment and a place to shoot a basket. On a Sunday morning in November, that was enough to bring a crowd out to see a former schoolyard become a park again.

Sources and receipts

These records support the reported claims and show when each source was published.

What did this story leave you thinking?

SIGN IN TO LIKE0

Reader responses

No responses yet. A thoughtful first note can change the shape of a conversation.