After a ribbon-cutting in Flint, Michigan, on Nov. 16, people did what the gathering was meant to make possible: they went for a walk. Patrick Hayes, reporting from the opening for Flint. Daily., described a ceremony and a walk along the first completed section of the Grand Traverse Greenway. The new path is just under a mile long. It begins off Kearsley Street, across from Chevy Commons, and leads south to Fenton Road near Interstate 69.
More than 100 people gathered at the trailhead, according to Genesee County, which helped build the project. Local residents joined representatives from the city, county and state. The park connection stood out in remarks from Tom Bissett, who leads the state Department of Natural Resources’ Parks and Recreation Division. He told the gathering that a neighborhood route or a nearby riverfront is often how families get outdoors. The paved trail gives people on the south side another way to reach the riverfront without needing to plan a trip outside the city.
The path is for nonmotorized use. A new parking lot at the Kearsley Street trailhead gives people coming from farther away a way to start there, too, Hayes reported. Walkers and riders can use the same stretch in either direction, whether they are heading toward the river or starting on the Chevy Commons side. People looking for the trailhead should look across Kearsley from Chevy Commons rather than assume the first leg starts inside the park.
Chevy Commons is one of several pieces of Flint State Park under development. The state’s project page identifies the greenway connector from Chevy Commons to Happy Hollow as completed. Happy Hollow is a wooded area near the meeting of Swartz and Thread creeks. It gives the state park a different setting from the riverfront areas closer to downtown. The larger park project also includes Riverbank Park, Mott Park Recreation Area and Vietnam Veterans Memorial Park. Those places are spread out, which makes the paths between them part of the work rather than an extra to add at the end.
The land at Chevy Commons used to serve a different purpose. The state traces it to a General Motors manufacturing site dating to the 1930s. The 67 acres now hold paths and native landscaping. A planned play garden near where Swartz Creek meets the Flint River remains on the construction schedule. The new greenway begins across the street from an area that was already changing before this ribbon was cut.
There is a difference, though, between opening a connection and finishing everything it leads to. The state continues to list construction at Chevy Commons and trail development at Happy Hollow. Those schedules are separate from the opening on Nov. 16. The completed greenway is a usable route; its opening does not mean every new facility or activity at Flint State Park is ready. The same distinction applies at the south end. WJRT reported that a later phase would take the trail toward Burton. For now, this newly opened phase ends at Fenton Road.
The Charles Stewart Mott Foundation contributed $1.2 million toward the first phase, according to Hayes and WJRT. That figure is one grant, not the entire construction cost. The trail also sits within Genesee County’s Legacy Trails Initiative, which aims to connect roughly 200 miles of nonmotorized routes across the county. At the ceremony, county commission chair Dale Weighill described how routes might bring people from different parts of the county into contact with one another. The idea depends on many more links over time, but Flint now has one of them in place.
On a map, the result of the opening is modest enough to see at a glance: a stretch of pavement between two streets. On the ground, it changes how someone can set out from the south side toward the river, or start at Chevy Commons and walk the other way. Before the rest of the network is built, the first segment already has the basic feature a trail needs to be useful. The next person who wants to walk it doesn’t have to wait for another ribbon to be cut.
Reader responses